Description
Ideally located, below the village of Veysonnaz, a few minutes from the plain.
The inhabitants will be able to live between the necessary daily amenities and the proximity of the mountain for relaxation and sports activities.
The design and construction are carried out by an architectural firm with many years of experience.
Construction in masonry and with quality materials, respecting the local spirit and neighboring buildings, while meeting the expectations and standards of comfort and energy consumption.
This 3.5-room apartment, 101 m2 is distributed as follows:
- Entrance hall
- Living room of 45 m2 with open kitchen, giving access to the terrace
- Master bedroom of 11 m2
- Bedroom 2 of 10.5 m2
- Bathroom with bath
- Bathroom with shower
- A 31 m2 and a private garden area accessible directly from the apartment.
In the basement, 2 covered parking spaces and a cellar complete this apartment.
The building also has a bicycle or stroller storage room.
Technical description:
- Motorized slat blinds on the day side
- Intercom
- Solar photovoltaic panels on the roof
- Hot water and heating production by air-water heat pump
- Supply for the washing column
Budget for the supply of sanitary fixtures:
Budget for the price of the exhibition
CHF 4,200.- TTC for the bathrooms
CHF 5,200.- TTC for the shower rooms
CHF 2,000.- TTC for the visitor toilets
Budget for the kitchen layout:
CHF 15,000.- TTC
Budget for floor coverings :
CHF 50.-/m2 TTC ceramic tiles according to customer’s choice, installation up to 40 x 40 cm for the hall, living room, kitchen, dining area and bathroom/WC
CHF 60.-/m2 TTC parquet according to customer’s choice for the bedrooms
Budget for wall coverings :
CHF 50.-/m2 TTC ceramic tiles
A complete construction description is available.
A full description of the construction is available.
The interiors can still be modified (subject to technical feasibility and direct invoicing),
the finishes are at the discretion of the purchasers, to be carried out by the supplier(s) and according to the pre-selection of the project manager.
Project that has obtained all the necessary authorizations.
Delivery expected at the end of 2026





